| Completion |
Project |
Location |
Description |
Owner |
Contact |
| Present |
Hyatt Contract Work |
CA |
Turbine Replacement |
DWR |
Sam Sublett |
| 2006 |
Hawi Wind Farm |
HI |
Installation of 16 Vestas V47-660 Wind Turbines |
Hawi Renewable Development, LLC |
Bob Treiberg - IES |
| 2005 |
Beardsley |
CA |
Turbine Replacement |
Tri Dam |
Edward J. Kisling |
| 2005 |
Puueo |
HI |
Turbine replacement and retrofit penstock and switch gear to new turbine model |
HELCO |
Norman Uchida |
| 2004 |
Bayano |
Panama |
Commissioning Work |
|
Sven Goran Bjuhr - GE Energy Sweden |
| 2004 |
Indian Valley |
CA |
Valve Seal and Penstock Repair |
|
|
| 2004 |
Esti |
Panama |
Commissioning Work |
|
Sven Goran Bjuhr - GE Energy Sweden |
| 2004 |
Horse Mesa |
AZ |
Commissioning Work |
Salt River Project |
GE Canada |
| 2004 |
Lake Success |
CA |
Recoating & corrosion repair for linings |
Lower Tule River Irrigation District |
Wayne Miner |
| 2003 |
Madera Power Plant |
CA |
Turbine Repair |
Chowchilla Water - Power Authority |
Douglas Welch |
| 2003 |
Mokulumne |
CA |
Estimating for 10 hydroelectric plants for flow modifications per FERC regulations |
PG&E |
Ed Hudson - Framatome |
| 2003 |
La Miel |
Columbia |
Start up, commissioing, & performance testing for turbines and generators |
National Electric Power Co. of Columbia |
Sven Goran Bjuhr - GE Energy Sweden |
| 2003 |
Caruachi |
Venezuela |
Commissioning Work |
|
Sven Goran Bjuhr - GE Energy Sweden |
| 2003 |
Invergary & Ceannacroc |
Scotland |
Commissioning Work |
|
Sven Goran Bjuhr - GE Energy Sweden |
| 2003 |
Tulloch Dam |
CA |
Turbine Coating of draft tube and stuffing box |
|
|
| 2002 |
Mormon Flat |
AZ |
60 MW pump turbine rehabilitation for Unit #2 reversible Francis type pump turbine |
Salt River Project |
Pablo Orozco - GE Hydro |
| 2002 |
Horse Mesa |
AZ |
113 MW pump turbine rehabilitation for Unit #4 reversible Francis type pump turbine |
Salt River Project |
Pablo Orozco - GE Hydro |
| 2002 |
Rio Bravo Hydro Plant |
CA |
Annual Maintenance |
Kern Hydro Partners |
Ed Hudson - IHD |
| 2002 |
Terminus Dam |
CA |
Annual Maintenance |
Kaweah River Power Authority |
Gene Kilgore - KRPA |
| 2002 |
Lake Success |
CA |
Wicket Gate Repair |
Lower Tule River Irrigation District |
Wayne Miner |
| 2002 |
Southbay Aquaduct |
CA |
Valve blasting & coating |
DWR |
Mike Michaels - SY Trading |
| 2001 |
Ponnequin Expansion |
CO |
Installation of 15 Vestas wind turbines |
Vestas-American Wind Technology |
Brian Merits - Vestas |
| 2001 |
Lake Gaillard |
CT |
Supervision & monitoring of maintenance for (1) cylinder casing Francis Turbine, (1) turbine controller, generator & auxiliary equipment |
Regional Water Authority |
George Lilya - GE Hydro |
| 2001 |
Drop 1 Station |
CA |
Removal, loading & transport of (1) Shinko 1950 kw generator |
Imperial Irrigation Dist. |
Pablo Orozco - GE Hydro |
| 2001 |
New Melones Dam |
CA |
Tie Rod Modification |
Bureau of Reclamation |
Richard Welsh - BOR |
| 2000 |
Mojave Siphon |
CA |
Installation of new locks for TSV 1,2,3 & TBV and limit switch for TBV |
DWR |
Pablo Orozco - GE Hydro |
| 2000 |
Blalock Dam |
SC |
Installation of 108" fixed cone energy dissipating valve & appurtenances |
Spartenburg Water District |
Pablo Orozco - GE Hydro |
| 2000 |
Terminus Dam |
CA |
Turbine repair and maintenance |
Kaweah River Power Authority |
Bob Treiberg - IES |
| 2000 |
Madera Power Plant |
CA |
Repair of runner blade assembly |
Chowchilla Water - Power Authority |
Douglas Welch |
| 1999 |
Rio Bravo Hydro Plant |
CA |
Repaired and replaced coatings and linings for 2 turbines, annual maintenance |
Kern Hydro Partners |
Ed Hudson - IHD |
| 1999 |
Mojave Siphon |
CA |
Installation of (3) 120" Butterfly Valves with 12" bypass systems |
DWR |
Pablo Orozco - GE Hydro |
| 1999 |
Belden Valves |
CA |
Installation and replacement seats for a 138" Butterfly Valve |
PG&E |
Difa Shveyd - PG&E |
| 1999 |
Terminus |
CA |
Turbine repair and maintenance |
Kaweah River Power Authority |
Bob Treiberg - IES |
| 1999 |
Lawrence Livermore Lab |
CA |
Installed wire system & set up generator for testing of wiring |
Lawrence Livermore National Lab |
Steve Ingram - Handling Specialty |
| 1998 |
Chelan Valves |
WA |
Valve Installation for (2) 90" butterfly valves |
Chelan Coutny PUD #1 |
Steve Weist - PUD |
| 1998 |
Rio Bravo Hydro Plant |
CA |
Replacement of carbon seals, repair motor shaft |
Kern Hydro Partners |
Ed Hudson - IHD |
| 1998 |
Ponnequin Wind Turbines |
CO |
Installation of 5.25 MW wind project. (7) NEG Micon wind turbines. |
Energy Unlimited, Inc. |
Mark Dawson - Energy Unlimited |
| 1997 |
Bellagio Hotel |
NV |
Supervision of installation & testing of underwater stage lifts |
Cirque Du Soleil |
Steve Ingram - Handling Specialty |
| 1997 |
Rio Bravo Hydro Plant |
CA |
Reinstalled & commissioned generators, re-installed (2) 7.5 MW vertical Kaplans |
Kern Hydro Partners |
Ed Hudson - Independent Hydro Developers |
| 1997 |
Hatchett Creek Hydro |
CA |
Clean & align generator, recommissioned 4 jet vertical Pelton turbine |
Mega Renewables |
Ed Hudson - Mega Renewables |
| 1997 |
Silver Springs |
CA |
Turbine repair and alignment |
Mega Renewables |
Ed Hudson -Mega Renewables |
| 1997 |
Cove Hydro |
CA |
Repair & align penstock |
Ida-West Energy Co. |
Henry Huber - Ida West |
| 1997 |
Rio Bravo Hydro Plant |
CA |
Tested electrical, stators & generator, refurbished stop logs |
Kern Hydro Partners |
Ed Hudson - IHD |
| 1997 |
Ponderosa Bailey Hydro |
CA |
Repair & replace thrust bearings and seals, install generator & horizontal Francis Turbine |
Ida-West Energy Co. |
Henry Huber - Ida West |
| 1997 |
Rio Bravo Hydro Plant |
CA |
Generator testing, maintenance & cleaning |
Kern Hydro Partners |
Ed Hudson - IHD |
| 1996 |
Cove Hydro |
CA |
Replaced & installed hydraulic piping, refurbished cylinders on Pelton turbine |
Ida-West Energy Co. |
Henry Huber - Ida West |
| 1996 |
El Dorado Powerhouse |
CA |
Serviced (2) 11.5 MW horizontal Peltons. Rehabilitation of Powerstation |
Pacific Gas & Electric |
El Dorado Irrigation District, Ferrel Ensign, Ensign & Buckley Bob Balletti - GE Hydro |
| 1996 |
El Dorado Penstock |
CA |
Manufacture & Install 800' of welded spiral 5' dia. Steel siphon penstock, thrust blocks and appurtenances |
Pacific Gas & Electric |
El Dorado Irrigation District, Ferrel Ensign, Ensign & Buckley Bob Balletti - GE Hydro |
| 1996 |
Mojave Siphon |
CA |
Install (3) 120" Butterfly valves & HCPU |
DWR |
Bob Balletti - GE Hydro |
| 1996 |
Red Bluff Diversion Dam |
CA |
Assessment, Evaluation & Rehabilitation of (2) 10' dia. X 55' long arcimedes screw pumps |
US Bureau of Reclamation |
Dallas Linford |
| 1995 |
Rio Bravo |
CA |
Troubleshot vib. & stability prob. on (2) 7.5 MW turbine/generator sets |
Kern Hydro Partners |
Independent Hydro Developers, Inc., Ed Hudson |
| 1994 |
Mojave Siphon |
CA |
Installation of (3) 12.5 MW, vertical Francis turbine/generator sets 3' -12' dia. Butterfly valves |
Department of Water Resources |
Doug Miller - American Hydro |
| 1994 |
Terminus Dam |
CA |
Removed, repaired and replaced leaking turbine shutoff valve scroll case joint seal, modified existing cable terminating & restraining system |
Kaweah River Power Authority |
Doug Miller - Amer. Hydro, Bob Treiberg - IES |
| 1994 |
Lighthouse Marina |
CA |
Assisted in redesign and remanufacture of pumps. |
Lighthouse Marina & Riverbend Dev. |
Al Fallon |
| 1993 |
San Gabriel |
CA |
disassemble, inspect and repair or replace generator components |
San Gabriel Hydroelectric Associates |
McGuire & Hester Contractors Joe Hester |
| 1993 |
Sacramento Metro Irrigation |
CA |
Installation of new 75 hp pump, 7' motorized alum. Reg. Gate, 10,000 LF of 24" RCP conduit |
County of Sacramento |
Peter Hughes - NCMWC |
| 1993 |
South Holston Dam |
TN |
Replacement of 180" Butterfly Valve under South Holston Lake |
Tennessee Valley Authority |
Bob Balletti - GE Hydro |
| 1993 |
Appalacia Hydro Powerhouse |
TN |
Refurbish (2) 144" Butterfly Valves |
Tennessee Valley Authority |
Bob Balletti - GE Hydro |
| 1992 |
Elkhorn, Pritchard & Verona Pumping Stations |
CA |
Remove and rebuild 5 pumps (1-175hp, 1-125hp, 3-200hp) |
Natomas Central Mutual Water Co. |
Peter Hughes - NCMWC |
| 1992 |
Pond Creek |
KY |
Disassemle, refurbish & reassemble (4) 4700 hp pumping units |
U.S. Army Dept. of Engineering |
Jim Lampsley |
| 1991 |
Forks of Butte |
CA |
Installation of (1) 16 MW, vertical Pelton turbine/generator set |
Energy Growth Partnership |
Phil Hoover - H&M Engineering Doug Miller - American Hydro |
| 1990 |
Sacramento Pumping Station |
CA |
Disassemble, refurbish & reassemble (4) 700 hp horizontal shaft pumps |
Reclamation District No. 1000 |
Jim Clifton - RD 1000 |
| 1990 |
Terminus Dam |
CA |
Installation of (1) 17.5 MW vertical shaft Kaplan turbine/generator 120' turbine shutoff valve |
Kaweah River Power Authority |
Doug Miller - American Hydro Bob Treiberg - IES |
| 1988 |
Black Butte |
CA |
Installation of (1) 7.2 MW vertical shaft Kaplan turbine/generator, 120" turbine shutoff valve |
City of Santa Clara |
Mr. Martin Hopper |
| 1988 |
Magic Dam |
ID |
Installation of (3) 3.5 MW horizotal Francis turbine brushless synchronous generators, 72" keystone butterfly valves |
Westinghouse Credit Corporation |
Niagara Turbine Systems, Inc. Mr. Steve Ingram |
| 1987 |
Lake Nacimiento |
CA |
Installation of (1) 4.5 MW horizontal Francis turbine/generator set, 66" turbine shutoff valve |
Monterey County Flood Control & Water District |
Mr. Mohammed Zaman |
| 1987 |
San Gabriel |
CA |
Installation of (1) 4.2 MW horizontal Francis turbine/generator set, 60" turbine shutoff valve |
San Gabriel Hydro Partnership |
Mr. Myles Duffy |
| 1986 |
Lower Camp Creek |
CA |
Installation of (1) 2 MW Pelton turbine |
Solar Research |
Craig Crouch - Solar Research |
| 1985 |
Raystown |
PA |
V. Francis |
Allegheny Electric Cooperative |
Richard Horn - Axel Johnson |
| 1985 |
Wise No. 2 |
CA |
H. Francis |
Pacific Gas & Electric |
Richard Horn - Axel Johnson |
| 1985 |
Weeks Falls |
WA |
H. Kaplan |
South Fork II |
Richard Horn - Axel Johnson |
| 1985 |
Nacimiento |
CA |
H. Francis |
Monterey Flood Control District |
Richard Horn - Axel Johnson |
| 1985 |
Stony Gorge Power Plant |
CA |
Installation of (2) 3.5 MW horizontal Francis turbine/generator sets 60" turbine shutoff valves |
City of Santa Clara |
Mr. Jerry Walker |
| 1985 |
Badger 1 |
CA |
H. Francis |
Santa Fe Irrigation District |
Richard Horn - Axel Johnson |
| 1985 |
Warm Springs |
CA |
V. Francis |
Sonoma County Water Agency |
Richard Horn - Axel Johnson |
| 1985 |
Pyrites |
NY |
Installation of (2) 3.5 MW horizontal Francis turbine/generator sets, 48" turbine shutoff vavles |
Hydra-Co. Enterprises |
Mr. John Cordes |
| 1985 |
San Luis Power Plant |
CA |
Installation of (1) 600 KW, 2500 MM horizontal Kaplan turbine, and generator set, 90" turbine shutoff valve |
Sverdrup Corporation |
Mr. Jerry Walker |
| 1985 |
Napil River |
Micronesia |
H. Francis |
State of Ponape-Micronesia |
Richard Horn - Axel Johnson |
| 1985 |
Wolfsen Power Palnt |
CA |
Installation of (1) 1000 KW, 1850 MM horizontal Kaplan turbine , and generator set, 90" turbine shutoff valve |
Sverdrup Corporation |
Mr. Jerry Walker |
| 1984 |
Stenner Canyon |
CA |
H. Pelton |
City of San Luis Obispo |
Richard Horn - Axel Johnson |
| 1984 |
Whitewater |
CA |
H. Francis |
Desert Water Agency |
Richard Horn - Axel Johnson |
| 1984 |
Logan No. 2 |
UT |
H. Francis |
City of Logan |
Richard Horn - Axel Johnson |
| 1984 |
Pyrites |
NY |
H. Francis |
Hydra-Co. & Pirites Assoc. |
Richard Horn - Axel Johnson |
| 1984 |
Galesville |
OR |
H. Francis |
Douglas County, OR |
Richard Horn - Axel Johnson |
| 1984 |
Lake Siskiyou |
CA |
H. Francis |
Box Canyon Partnership |
Richard Horn - Axel Johnson |
| 1984 |
Owyhee |
OR |
H. Francis |
Owhee Irrigation District |
Richard Horn - Axel Johnson |
| 1984 |
Farmers No. 2 |
OR |
H. Francis |
Farmers Irrigation District |
Richard Horn - Axel Johnson |
| 1984 |
Lower Camp Creek |
CA |
H. Pelton |
Solar Research |
Richard Horn - Axel Johnson |
| 1984 |
San Gabriel Dam |
CA |
H. Francis |
San Gabriel Hydro Partnership |
Richard Horn - Axel Johnson |
| 1984 |
New Hogan |
CA |
H. Francis |
Modesto Irrigation District |
Richard Horn - Axel Johnson |
| 1984 |
Emporia |
CA |
V. Kaplan,V. Semi-Kaplan |
Synergics, Inc. |
Richard Horn - Axel Johnson |
| 1984 |
Summer Falls Power Project |
WA |
V. Kaplan, (2) 96" TBV |
Grant County PUD |
Howard Horn - Shirley Co. |
| 1984 |
Middle Fork |
OR |
H. Pelton H. Francis |
Middle Fork Irrigation District |
Richard Horn - Axel Johnson |
| 1984 |
Glen Park |
NY |
V. Kaplan |
Mercer Companies |
Richard Horn - Axel Johnson |
| 1983 |
Merrill |
WI |
H. Kaplan |
Wisconsin Public Service |
Richard Horn - Axel Johnson |
| 1983 |
Fairfield Canal |
CA |
H. Kaplan |
Turlock Irrigation District |
Richard Horn - Axel Johnson |
| 1983 |
Drop 1 |
CA |
H. Kaplan |
Imperial Irrigation Dist. |
Richard Horn - Axel Johnson |
| 1983 |
R.W. Matthews |
CA |
H. Francis |
Humbolt Bay Mun. Water Dist. |
Richard Horn - Axel Johnson |
| 1983 |
Rock Island |
NY |
H. Kaplan |
Cataldo HydroPower Assoc. |
Richard Horn - Axel Johnson |
| 1983 |
Canal Creek |
CA |
H. Kaplan |
Turlock Irrigation District |
Richard Horn - Axel Johnson |
| 1983 |
Port Leyden |
NY |
H. Kaplan |
Cataldo HydroPower Assoc. |
Richard Horn - Axel Johnson |
| 1983 |
Lake Mendocino |
CA |
H. Francis |
City Of Ukiah |
Richard Horn - Axel Johnson |
| 1983 |
Unionville |
NY |
H. Kaplan |
Potsdam Power Partnership |
Richard Horn - Axel Johnson |
| 1983 |
Hewittville |
NY |
H. Kaplan |
Potsdam Power Partnership |
Richard Horn - Axel Johnson |
| 1983 |
Fort Miller |
NY |
H. Pit Kaplan |
Fort Miller Assoc. |
Richard Horn - Axel Johnson |
| 1983 |
Stampede |
CA |
V. Francis |
Bureau of Reclamation |
Richard Horn - Axel Johnson |
| 1983 |
Sultan River Basin |
WA |
6-Jet Impulse Machines, 2 horizontal shaft 10 MW machines, (2) 96" TSV |
Snohomish County PUD |
Howard Horn - Shirley Co. |
| 1983 |
Kents Falls |
NY |
V. Francis |
New York State Electric & Gas |
Richard Horn - Axel Johnson |
| 1983 |
Bowman |
CA |
H. Francis |
Nevada City Irrigation District |
Richard Horn - Axel Johnson |
| 1983 |
Valley Falls |
NY |
H. Pit Kaplan |
William Bantz |
Richard Horn - Axel Johnson |
| 1983 |
Mirimar |
CA |
H. Francis |
San Diego Water Authority |
Richard Horn - Axel Johnson |
| 1983 |
Clement Dam |
NH |
H. Kaplan |
Seaward Constuction |
Richard Horn - Axel Johnson |
| 1983 |
Alvarado |
CA |
H. Francis |
San Diego Water Authority |
Richard Horn - Axel Johnson |
| 1982 |
Hamakua |
HI |
H. Semi-Kaplan |
Hawaiian Commercial & Sugar |
Richard Horn - Axel Johnson |
| 1982 |
Olokele |
HI |
H. Francis |
Olokele Sugar Co. |
Richard Horn - Axel Johnson |
| 1982 |
Potsdam |
NY |
V. Semi-Kaplan |
Village of Posdam |
Richard Horn - Axel Johnson |
| 1982 |
Indian Valley |
CA |
H. Francis H. Turgo |
Yolo County Flood Control |
Richard Horn - Axel Johnson |
| 1982 |
Garfield |
VT |
H. Francis |
Morrisville Water & Light |
Richard Horn - Axel Johnson |
| 1982 |
Mt. Ida |
NY |
H. Francis |
Mt. Ida Associates |
Richard Horn - Axel Johnson |
| 1982 |
Point Loma |
CA |
V. Francis |
City Of San Diego |
Richard Horn - Axel Johnson |
| 1982 |
Garland Canal |
WY |
H. Semi-Kaplan |
Shoshone Irrigation Dist. |
Richard Horn - Axel Johnson |
| 1982 |
Capitola |
NC |
H. Kaplan |
French Broad Electric Cooperative |
Richard Horn - Axel Johnson |
| 1981 |
Pyramid Lake |
CA |
6-Jet Impulse Machines, (2) 96" TSV, (2) 65,000 hp |
DWR |
Howard Horn - Shirley Co. |
| 1980 |
Rollins Lake |
CA |
V. Francis |
Nevada City Irrigation District |
Richard Horn - Axel Johnson |
| 1980 |
Rollins Lake |
CA |
V. Francis |
Nevada City Irrigation District |
Howard Horn - Shirley Co. |