SITE CONSTRUCTORS INC
  • Home
  • Company
    • About Us
    • Our Work
    • Our Clients
  • Services
    • Wind
    • Hydro
    • Batteries
    • Solar
    • Biomass
  • Contact
  • News
  • Services
Celebrating over 35 Years

Battery Energy Storage

Overall Experience 125MWH

Coastal I

Coastal 1 was the first of the new generation batteries to be installed in Hawaii. Coastal 1 is a 1 MW lithium Titanate battery that is programmable for different uses but is now used for power smoothing as well as frequency control. The battery was installed 2012, and has been performing well every since.

Coastal ll

SCI was the installation contractor for the Coastal ll battery installation for Altair-Nano. The battery installation is located  in the Campbell Industrial Park for Hawaiian Electric Company (HECO). The 1.5 MW battery is used for grid stability in the HECO grid. Construction began in the summer of 2015 and commissioned during the first quarter of 2016.


Coastal III

SCI completed a new 2.5 MW battery system on the island of Molokai, Hawaii for Altair-Nano. The battery system stabilized the small island grid, a division of Maui Electric Company (MECO). SCI was the Engineer Procure Construct contractor (EPC) for this project. Construction of the project began in November 2015 and complete by March of 2016.

 
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Site Constructors Inc. ©
                                                                                                    
Corporate Office
55 Independence Circle, Suite 105 
Chico, California 95973  

Tel: (530)342-8545
Fax: (530)342-9754
​Email: [email protected]
Proudly powered by Weebly
  • Home
  • Company
    • About Us
    • Our Work
    • Our Clients
  • Services
    • Wind
    • Hydro
    • Batteries
    • Solar
    • Biomass
  • Contact
  • News
  • Services