Hawi Wind Farm 

SCI has completed stage one of the Hawi Repower that consisted of refurbishing eight of the sixteen V-147 wind turbines . Stage two is expected to start in Q4 of 2024.

Hale Kuawehi Solar 

SCI is currently constructing a 30MW solar photovoltaic and 120 MWh battery energy storage system at Parker Ranch, on the Big Island of Hawaii. The project is expected to power approximately 16,750 homes on the island. 
https://www.innergex.com/en/sites/hale-kuawehi​

Coachella Flats / San Jacinto Wind Project


SCI completed the repower of the existing 58.8 MW wind farm located in Palm Springs, CA. Repower replaced 17 existing wind turbines with 13 new V117-3.6 MW, 4 new V112-3.6 turbine, and updated  infrastructure.

Painted Hills / Desert Hot Springs Wind Project

SCI completed the repower of the existing 44.536 MW wind farm located near Palm Springs, CA. Repower included the replacement of older generation wind turbines with 13 new V117-.36 MW machines and updates to infrastructure.   


Na Pua Makani Wind Project

SCI completed construction of the 25MW wind farm located near Kahuku on the north shore of Oahu. Power from the project is sold to Hawaiian Electric Company (HECO) and is expected to reduce Hawaii's CO2 emissions from energy production by an additional 1 million tons in its 20-year life.
https://www.aes-hawaii.com/na-pua-makani-project

​Lalamilo Wind Project 

SCI developed and permitted a 3.3 MW wind farm on the Big Island of Hawaii and was the EPC contractor for the project, owned by Lalamilo Wind Company LLC. Construction of the wind project began in July 2015 and completed late 2016. The project utilizes 5 Vestas V-47 660kw wind turbines, a new switching station, and an ABB statcom, along with a new SCADA system for interfacing with the Department of Water Supply pumping stations and reservoirs.
http://www.northhawaiinews.com/waikoloa-trades-winds-for-water/

Huntington Wind Project

SCI completed construction on a 50MW wind farm in Huntington, Oregon. The Project is located 40 miles Southeast of Baker City in Baker County, Oregon.

Coastal I Battery 

Coastal I was the first of the new generation batteries to be installed in Hawaii. Coastal I is a 1 MW lithium Titanate battery that is programmable for different uses but is now used for power smoothing as well as frequency control. The battery was installed 2012, and has been performing well ever since.


Coastal ll Battery

SCI was the installation contractor for the Coastal ll battery installation for Altair-Nano. The battery installation was in the Campbell Industrial Park for Hawaiian Electric Company (HECO). The 1.5 MW battery is used for grid stability in the HECO grid. Construction was completed the beginning of 2016.


Coastal III Battery

SCI completed the 2.5 MW battery system on the island of Molokai, Hawaii for Altair-Nano. The battery is for the stabilization of the small island grid, a division of Maui Electric Company (MECO). SCI was the Engineer Procure Construct contractor (EPC) for this project. Construction was completed in 2016.


​                                                                        Site Constructors Inc. ©

                                                                                                           Chico, California USA
Office
55 Independence Circle, Suite 105 
Chico, California 95973  

Tel: (530)342-8545
Fax: (530)342-9754
​Email: [email protected]
Proudly powered by Weebly
  • Home
  • Company
    • About Us
    • Our Work
    • Our Clients
  • Services
    • Wind
    • Hydro
    • Batteries
    • Solar
    • Biomass
  • Contact
  • News
  • Services