NA PUA MAKANI WIND PROJECT
Construction on the 25MW wind farm located near Kahuku on the north shore of Oahu is scheduled to be complete in April 2020. Power from the project will be sold to Hawaiian Electric Company (HECO) and is expected to reduce Hawaii's CO2 emissions from energy production by an additional 1 million tons in its 20-year life.
Lalamilo Wind Project
SCI has developed and permitted a 3.3 MW wind farm on the Big Island of Hawaii. Site Constructors is the EPC contractor for the project which is owned by Lalamilo Wind Company LLC. Construction of the wind project began in July 2015 and completed late 2016. The project utilizes 5 Vestas V-47 660kw wind turbines, a new switching station, and an ABB statcom, along with a new SCADA system for interfacing with the Department of Water Supply pumping stations and reservoirs.
http://www.northhawaiinews.com/waikoloa-trades-winds-for-water/
Huntington Wind Project
SCI completed construction on a 50MW wind farm in Huntington, Oregon. The Project is located 40 miles Southeast of Baker City in Baker County, Oregon.
Coastal I
Coastal I was the first of the new generation batteries to be installed in Hawaii. Coastal I is a 1 MW lithium Titanate battery that is programmable for different uses but is now used for power smoothing as well as frequency control. The battery was installed 2012, and has been performing well ever since.
Coastal ll
SCI was the installation contractor for the Coastal ll battery installation for Altair-Nano. The battery installation was in the Campbell Industrial Park for Hawaiian Electric Company (HECO). The 1.5 MW battery is used for grid stability in the HECO grid. Construction was completed the beginning of 2016.
Coastal III
SCI completed the 2.5 MW battery system on the island of Molokai, Hawaii for Altair-Nano. The battery is for the stabilization of the small island grid, a division of Maui Electric Company (MECO). SCI was the Engineer Procure Construct contractor (EPC) for this project. Construction was completed in 2016.
Construction on the 25MW wind farm located near Kahuku on the north shore of Oahu is scheduled to be complete in April 2020. Power from the project will be sold to Hawaiian Electric Company (HECO) and is expected to reduce Hawaii's CO2 emissions from energy production by an additional 1 million tons in its 20-year life.
Lalamilo Wind Project
SCI has developed and permitted a 3.3 MW wind farm on the Big Island of Hawaii. Site Constructors is the EPC contractor for the project which is owned by Lalamilo Wind Company LLC. Construction of the wind project began in July 2015 and completed late 2016. The project utilizes 5 Vestas V-47 660kw wind turbines, a new switching station, and an ABB statcom, along with a new SCADA system for interfacing with the Department of Water Supply pumping stations and reservoirs.
http://www.northhawaiinews.com/waikoloa-trades-winds-for-water/
Huntington Wind Project
SCI completed construction on a 50MW wind farm in Huntington, Oregon. The Project is located 40 miles Southeast of Baker City in Baker County, Oregon.
Coastal I
Coastal I was the first of the new generation batteries to be installed in Hawaii. Coastal I is a 1 MW lithium Titanate battery that is programmable for different uses but is now used for power smoothing as well as frequency control. The battery was installed 2012, and has been performing well ever since.
Coastal ll
SCI was the installation contractor for the Coastal ll battery installation for Altair-Nano. The battery installation was in the Campbell Industrial Park for Hawaiian Electric Company (HECO). The 1.5 MW battery is used for grid stability in the HECO grid. Construction was completed the beginning of 2016.
Coastal III
SCI completed the 2.5 MW battery system on the island of Molokai, Hawaii for Altair-Nano. The battery is for the stabilization of the small island grid, a division of Maui Electric Company (MECO). SCI was the Engineer Procure Construct contractor (EPC) for this project. Construction was completed in 2016.
Site Constructors Inc. ©
Chico, California USA
Office
55 Independence Circle, Suite 105
Chico, California 95973
Tel: (530)342-8545
Fax: (530)342-9754
Email: mail@siteconstructors.net